50°C
30°C
AI server rack
≈45°C
T_return ≈ 45°C · liquid loop → cooling tower
30°C
35°C
40°C
45°C
50°C
a hot shower
rack water
Cooling tower
heat thrown into the air
90–95% OF THE POWER ENDS UP AS HEAT · ARUP
direct-to-chip liquid cooling
0.0
TWh
used by Singapore's data centres in 2024
>10%
of the country's electricity
Where a data centre's water goes
up to
0%
evaporates from cooling towers
Sources: Eco-Business (2026); Linklaters (2024)
One site, one fixed grid connection: 16 MW
IT load · 10 MW
Cooling + overhead · 6 MW
every kW here can't run AI
PUE = 16 MW ÷ 10 MW = 1.6 · example site from our deck, air-cooled today
Stockholm
data-centre heat goes into district heating
Needs: space heating
Singapore
a typical humid afternoon: 31°C, 80% humidity
outdoor air
Needs: drier air
Qiran Liu · Likun Ni · National University of Singapore
Software that puts the same heat to work twice
Stage 1 · On site
Stage 2 · Community
Chiller coil
A
B
Desiccant coil
regenerated at 38–50°C
Outdoor air
31°C · 80% RH · 22.9 g/kg
Dry air
15°C dew point · 10.6 g/kg
Evaporative cooler
more capacity in dry air
AI racks (CDU)
return water 40–50°C
≈330 kW of heat
put to work
warm, humid exhaust
Exhaust condenser
cooled by 28–30°C water
Water back
2–5 m³ / day
Electricity to dry one
8 m³/s fresh-air stream
0 kW
Over-cool
to dry
0 kW
Waste-heat
drying
−48
+200–330 kW
of IT capacity freed per site, on the same grid connection
≈50 kW · heat-driven drying
+
140–280 kW · smarter plant control
About 2% of IT load. The operator's own liquid-cooling upgrade is not counted.
Neighbours within about 0.5 km of a data-centre cluster
Data centre
surplus heat
→ 75°C via heat pump
→ 40–50°C direct
Metered and billed:
0
MWh a year per link
One 1.5 MW link to a central kitchen
S$ thousand a year
S$1.57M
net shared value a year
Split by contract between operator and offtaker; two-D earns 15–20%.
Map data: geoBoundaries, from URA (ODbL 1.0). Impact figures: team calculation.
6 DATA-CENTRE CLUSTERS · 20 PRECINCT LINKS · ONE SHARED HEAT NETWORK (2030 TARGET)
CHANGI NORTH
→ SATS in-flight kitchens
hot water from waste heat
WOODLANDS
→ Woodlands Wafer Fab Park
drier air for cleanrooms
JURONG ISLAND
→ refining and chemical plants
STDCT 2.0 waste-heat testbed (planned)
One OS links every site
heat is matched, metered and billed across the network
0
tCO₂e avoided a year
≈ yearly electricity emissions of
22,000
four-room HDB flats
0
m³ of water saved a year
≈
100
Olympic swimming pools
City scale, 2030 target: 25% of the installed base + 20 export links.
HDB: 380.7 kWh/month (MSE, 2024) × 0.402 kg CO₂/kWh · pool = 2,500 m³
Next step
2027
Testbed validation
at NUS STDCT 2.0
Sustainable Tropical Data Centre Testbed
2028
First precinct link
1–2 MW pilot
2030
City scale
≈28 sites + 20 links
Every AI data centre is already a heat plant.
Let's put that heat to work,
twice.
Team two-d (2d) · Qiran Liu & Likun Ni · National University of Singapore
Global Sustainability Challenge 2026–27 · Sustainable Energy
Likun Ni
● REC
▶ Play
⟲
0:00.0 / 0:00.0
Load audio file
Captions: on
Clean view (H)