50°C30°C AI server rack ≈45°C T_return ≈ 45°C · liquid loop → cooling tower 30°C35°C 40°C45°C 50°C a hot shower rack water Cooling tower heat thrown into the air 90–95% OF THE POWER ENDS UP AS HEAT · ARUP direct-to-chip liquid cooling 0.0TWh used by Singapore's data centres in 2024 >10% of the country's electricity Where a data centre's water goes up to 0% evaporates from cooling towers Sources: Eco-Business (2026); Linklaters (2024) One site, one fixed grid connection: 16 MW IT load · 10 MW Cooling + overhead · 6 MW every kW here can't run AI PUE = 16 MW ÷ 10 MW = 1.6 · example site from our deck, air-cooled today Stockholm data-centre heat goes into district heating Needs: space heating Singapore a typical humid afternoon: 31°C, 80% humidity outdoor air Needs: drier air Qiran Liu · Likun Ni · National University of Singapore Software that puts the same heat to work twice Stage 1 · On site Stage 2 · Community Chiller coil AB Desiccant coilregenerated at 38–50°C Outdoor air31°C · 80% RH · 22.9 g/kg Dry air15°C dew point · 10.6 g/kg Evaporative coolermore capacity in dry air AI racks (CDU) return water 40–50°C ≈330 kW of heatput to work warm, humid exhaust Exhaust condenser cooled by 28–30°C water Water back 2–5 m³ / day Electricity to dry one 8 m³/s fresh-air stream 0 kW Over-coolto dry 0 kW Waste-heatdrying −48 +200–330 kW of IT capacity freed per site, on the same grid connection ≈50 kW · heat-driven drying + 140–280 kW · smarter plant control About 2% of IT load. The operator's own liquid-cooling upgrade is not counted. Neighbours within about 0.5 km of a data-centre cluster Data centresurplus heat → 75°C via heat pump → 40–50°C direct Metered and billed: 0 MWh a year per link One 1.5 MW link to a central kitchen S$ thousand a year S$1.57M net shared value a year Split by contract between operator and offtaker; two-D earns 15–20%. Map data: geoBoundaries, from URA (ODbL 1.0). Impact figures: team calculation. 6 DATA-CENTRE CLUSTERS · 20 PRECINCT LINKS · ONE SHARED HEAT NETWORK (2030 TARGET) CHANGI NORTH→ SATS in-flight kitchenshot water from waste heat WOODLANDS→ Woodlands Wafer Fab Parkdrier air for cleanrooms JURONG ISLAND→ refining and chemical plantsSTDCT 2.0 waste-heat testbed (planned) One OS links every siteheat is matched, metered and billed across the network 0 tCO₂e avoided a year ≈ yearly electricity emissions of 22,000 four-room HDB flats 0 m³ of water saved a year ≈ 100 Olympic swimming pools City scale, 2030 target: 25% of the installed base + 20 export links.HDB: 380.7 kWh/month (MSE, 2024) × 0.402 kg CO₂/kWh · pool = 2,500 m³ Next step 2027 Testbed validation at NUS STDCT 2.0 Sustainable Tropical Data Centre Testbed 2028 First precinct link 1–2 MW pilot 2030 City scale ≈28 sites + 20 links Every AI data centre is already a heat plant. Let's put that heat to work, twice. Team two-d (2d) · Qiran Liu & Likun Ni · National University of Singapore Global Sustainability Challenge 2026–27 · Sustainable Energy
Likun Ni
● REC
0:00.0 / 0:00.0